How It Works
From first contact to move-in, our streamlined process delivers your home efficiently.
Consultation
We discuss your needs, site, and budget.
- Initial call or video meeting
- Site assessment questionnaire
- Budget range discussion
Design
Architects adapt or create your floor plan.
- 2D floor plans and elevations
- Material and finish selection
- Technical specifications
Production
Factory-built with precision and quality control.
- Factory-controlled environment
- Quality checks at each stage
- Weather-independent schedule
Delivery
Modules transported to your prepared site.
- Professional logistics team
- Route planning and permits
- Crane positioning
Installation
Professional assembly, typically 1-3 days.
- Module connection and leveling
- Utility hook-ups
- Finishing touches
Handover
Final inspection and keys to your new home.
- Walk-through inspection
- Documentation package
- Warranty and support
Frequently Asked Questions
How long does the entire process take?
From contract signing to move-in, typical timelines are 12-20 weeks depending on the size and complexity of your project. The on-site installation itself usually takes only 1-3 days.
Do I need to prepare the foundation myself?
Yes, the foundation needs to be prepared before module delivery. We provide detailed foundation specifications, and we can recommend local contractors if needed.
What permits do I need?
Building permit requirements vary by country and municipality. In Germany, modular homes typically require standard building permits. We provide all technical documentation needed for permit applications.
Can modules be transported to any location?
We deliver across Europe. Transport feasibility depends on site access. Our logistics team will assess your site and plan the optimal delivery route.
What warranty do you provide?
We provide a comprehensive warranty covering structural elements, waterproofing, and installations. Specific warranty terms are detailed in your contract.